JDA is performing the Special Inspections of the Phase II expansion of the Navy Federal Credit Union which includes; Buildings 7 & 8 - both 441,000 sf steel framed office structures; Parking Decks 3 & 4 that are precast concrete framed and both 851,000 sf and the steel framed 154,000 sf Amenities Building.
This grocery store structure consited of a 5,800 SF addition and renovation to the existing 11,300 SF cooperative health food store as well as the renovation of an existing 2,300 SF building that was now serve's as the Community Room. Ever'Man required this project reflect their environmentally-conscious mission, and encouraged the design team to incorporate sustainable design practices. As a result, the project is designed and is being constructed to LEED Gold v3.0 standards for new construction and major renovations.
Approximately 45,000 sf commercial development in Wilmington, NC with an approximately 1700 sf façade structure. JDA was responsible for the engineering of the façade structure including the foundations, the structural steel framing, and the attachment of the structure back to the main building.
"Congratulations on our hard work! With some additional effort at the Stage II level we achieved 3 Green Globes. We were tasked with only achieving 2!" -Rus Calhoun
Rehabilitation of old metal building for use as a Bank office Building. This is a single story old metal building structure is demolished except for the A-frames. A-frames were strengthened with steel plates. New structural steel framing is provided for two story office building utilizing the strengthened A-frames.
NOW HIRING! SENIOR STRUCTURAL ENGINEER POSITION