Projects Condominiums

Phoenix Gulf TowersOrange Beach, AL

Gallery of 2 Pictures

Phoneinx Gulf Towers West and East is a two tower development located in Orange Beach, Alabama. Each condominium tower will be approximately 350,000 sf and 26-stories tall with an attached 130,000 sf, 7-story parking garage. The towers will be constructed of reinforced concrete and supported on hundreds of precast concrete pilings bearing more than 80ft below grade.

  • Architect: John Senkarik
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 3,500,002
  • Stories: 26
  • Year: 2023

Phoenix WestOrange Beach, AL

Gallery of 3 Pictures

This project consists of a 29 story concrete framed condominium structure with an 8-story parking garage. Lateral Load Resisting System: Concrete shear walls; Floor Framing: flat plate post-tensioned slabs; Foundation System: precast piling. Unusual features include 46' tall steel roof with 12:12 slope, full height atrium space, glass roof over atrium, large unsupported exterior wall on one side of atrium.

  • Architect: John Senkarik & Associates
  • JDA's Role: Structural Engineer of Record
  • Stories: 29
  • Year: 2005
  • Cost: $140,000,000

Phoenix West IIOrange Beach, AL

This is a multi-family residential, concrete framed structure with a 12-story parking garage. Lateral force resisting system: concrete shear wall; floor systems: post tensioned concrete slabs; foundation system: precast piling system. Unique design features: transfer floors and girders at various level for shear flow continuity between shear walls at different locations. Roof garden at level 15. Two story tall open spaces at various levels with two story tall meeting space at level 15.

  • Architect: John Senkarik & Associates
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 1,937,104
  • Stories: 34
  • Year: 2011
  • Cost: $190,000,000

Phoenix Gulf ShoresGulf Shores, AL

Gallery of 5 Pictures

This 360,000 sf structure consists of 22 occupied floors plus roof, stair and elevator tower slabs, along with a six-story parking garage with a 7th floor for tennis courts with reinforced cast-in-place concrete with post-tension concrete floor slabs. The structure sits on concrete pile caps supported by 435 pre-stressed concrete pilings bearing approximately 66 ft below sea-level. 

  • Architect: John Senkarik & Associates
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 360,000
  • Stories: 22
  • Year: 2019

Phoenix Orange Beach CondominiumOrange Beach, AL

This is a 114 unit, 21 story reinforced concrete condominium structure with approximatly 402,400 sf with a 10-story detached reinforced concrete parking garage at approximately 143,500 sf.  The upper level of the parking deck will be used a tennis court.  The pool will be on-grade under the main building. 

  • Architect: John Senkarik & Associates
  • JDA's Role: Structural Engineer of Record and Inspector
  • Year: 2019

Vista Del Mar CondominiumPerdido Key, FL

Gallery of 4 Pictures

This is a 276,000 sf 9-story structure with concrete framing and post-tensioned flat plate floor framing, concrete columns and shearwalls. There is a structured pool on the second floor. Structural challenges include: Long spans and difficult layout of shearwalls. Structural Design was completed with REVIT 2015. This unique building design captures panoramic views of the Gulf of Mexico.

“Josh has done a good job with the Vista del Mar Condominium. After much hard work to make the design as efficient as possible, the turning point was when Josh spent all that time calculating the total amount of steel, turning a huge change order add into a savings. That was an eye opener for the Owner and Contractor, and I greatly appreciate the work you guys put into that.”  -Forrest Daniell

  • Architect: Forrest Daniell and Associates
  • JDA's Role: Structural Engineer of Record and Inspector
  • Square Feet: 296,000
  • Stories: 9
  • Year: 2018

Phoenix IXOrange Beach, AL

Gallery of 3 Pictures

Fourteen elevated 9" thick flat-plate post-tensioned slabs made with lightweight structural concrete make up the floor system; 24" thick concrete shear walls cantilever out 30' over the foundation providing vertical and lateral support for the building.Other features include 4 levels of interior parking, a conventional swimming pool on the 6th floor, and a tennis court on the 12th floor.

  • Architect: John Senkarik & Associates
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 320,000
  • Stories: 15
  • Year: 2008
  • Cost: $38,400,000

Admiral's QuartersOrange Beach, AL

This condominium structure is 15 stories and 351,000 sf. Post-tensioned flat plate 9" thick, with 30'-3" spans and 11'-0" cantilevers. 14'-4" cantilevers utilizing 10 1/2 " flat plate. All 10" wall supported - no columns.

  • Architect: Henry Norris & Associates
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 351,000
  • Stories: 15
  • Cost: $26,300,000

MirabellaPerdido Key, FL

Gallery of 4 Pictures

The project consisted of post-tensioned flat plate, 8" thick, 10,000 psi 12"x24" and 24" diameter columns, spans vary, cantilevers 7'-0", heavily reinforced shearwall core with two (2) - 96" thick 84-pile pile caps, original design called for 18" pre-cast piles with 123 tons compression, and 32.5 tons tension. Augercast displacement piles were substituted as a value-engineering item.

  • Architect: Bay Area Architects
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 181,000
  • Stories: 18
  • Cost: $13,422,000

Palms of PerdidoPerdido Key, FL

Gallery of 2 Pictures

Post-tensioned flat plate 8” thick with various spans and 8’ cantilevers with 12"x24" columns with 12" thick reinforced elevator/stairwell core with 18” auger-cast-in-place piles including one 105 pile cap.

  • JDA's Role: Structural Engineer of Record
  • Square Feet: 133,000
  • Stories: 14
  • Year: 2006

San CarlosGulf Shores, AL

The building consists of 19 elevated 9" thick post-tensioned flat plate slabs, second level parking, 3rd-19th levels residential, and roof. 12" thick concrete walls provided vertical and lateral support. Precast prestressed concrete pile and augercast displacement pile foundation design options were given.

  • Architect: Henry Norris & Associates
  • JDA's Role: Structural Engineer of Record
  • Square Feet: 351,000
  • Stories: 19
  • Year: 2005
  • Cost: $27,500,000

\

Industry News

JDA IS HIRING! SENIOR STRUCTURAL ENGINEER

NOW HIRING! SENIOR STRUCTURAL ENGINEER POSITION


JDA Attends NB Cook School of the Arts STEAM Night


Would You Like to Join Our Talented Team of Engineers? WE ARE HIRING!


Phoenix Orange Beach II Drone Video


The Eglin Variable Height Tower made the cover of the Eglin 2019 Engineering Design Manual!


JDA Visits New Multi-Million Dollar ST Aerospace Hangar


JDA Project Wins United States Air Force Merit Award for Facility Design


UWF Laboratory Annex Jobsite Camera


Team
Projects
Expertise

(c) 2024 Joe DeReuil Associates, LLC. All Rights Reserved
Phone: (850) 429-1951 • 301 West Cervantes Street, Pensacola, FL 32501

This is an outdated browser. For optimal viewing and security we recommend that you keep your browser up to date. Learn more at BrowserUpdate.Org.